Photo Gallery
Project Gallery
Before-and-after documentation from completed FES remediation and sanitization projects across Maine.
Each project below is fully documented from initial assessment through post-remediation clearance. Photos are shown with client permission.
Case Study 01 — Basement Mold Remediation, Gorham ME
| Property Type | Single-family residence, 1970s construction |
| Issue | Visible mold growth on basement framing and OSB subfloor |
| Cause | Chronic groundwater intrusion, inadequate exterior drainage |
| Scope | ~340 sq ft affected area |
| Clearance | ✅ Passed independent air sampling post-remediation |


Approach: Full containment, HEPA vacuuming, antimicrobial treatment of framing. Two sections with deep penetration removed and replaced. French drain installation recommended. Clearance confirmed.
Case Study 02 — Attic Mold Remediation, Westbrook ME
| Property Type | Split-level home, pre-listing inspection discovery |
| Issue | Mold on attic sheathing from inadequate ventilation |
| Cause | Bathroom exhaust fan venting into attic (code violation) |
| Scope | ~520 sq ft of roof sheathing |
| Clearance | ✅ Passed; real estate sale proceeded on schedule |


Approach: Sheathing wire-brushed, HEPA-vacuumed, treated. Bathroom fan duct rerouted as part of project. Clearance documentation provided to buyer’s agent within 5 business days.
Case Study 03 — Mold Assessment & Treatment, Portland ME
| Property Type | Residential property |
| Issue | Moisture intrusion and mold growth |
| Scope | Multiple affected areas |
| Clearance | ✅ Post-remediation verification passed |


Case Study 04 — Crawl Space Remediation, Scarborough ME
| Property Type | Cape Cod, home purchase inspection flag |
| Issue | Mold on floor joists throughout crawl space |
| Cause | Missing vapor barrier, open foundation vents |
| Scope | Full crawl space, ~900 sq ft of joist surface |
| Clearance | ✅ Passed; mortgage lender satisfied, sale closed |


Approach: Full remediation plus 20-mil vapor barrier installation. Joist treatment retained structural material. Lender documentation package delivered within 48 hours of clearance.
Want to See More Project Documentation?
Call us — we’re happy to walk through project photos and documentation relevant to your specific situation.
Call 207-464-8202 Get a Free Assessment
